Blog icon

Our Stage 5 Interim Summary Report and Interim Stage 5 reports below provide an update on the progress of Australia’s Global Power System Transformation (G-PST) Roadmap which was launched in 2022. In 2025, the G-PST initiative evolved and, in Australia, now operates under the lead of CSIRO and AEMO as the Australian Research in Power Systems Transition (AR-PST).

Development of the Roadmap represented Stage 1 work which outlined a research path across nine key topics on preparing a power system that provides secure and reliable operation during the energy transition to a decarbonised electrical grid with high penetration of renewables.

AR-PST Stage 5 Interim Reports by topic:

Request accessibility assistance

Some elements of the documents included on this page may not be accessible to assistive technologies. Please contact us to request further accessibility assistance.

Our Stage 5 Interim Summary Report and Interim Stage 5 reports below provide an update on the progress of Australia’s Global Power System Transformation (G-PST) Roadmap which was launched in 2022. In 2025, the G-PST initiative evolved and, in Australia, now operates under the lead of CSIRO and AEMO as the Australian Research in Power Systems Transition (AR-PST).

Development of the Roadmap represented Stage 1 work which outlined a research path across nine key topics on preparing a power system that provides secure and reliable operation during the energy transition to a decarbonised electrical grid with high penetration of renewables.

AR-PST Stage 5 Interim Reports by topic:

Request accessibility assistance

Some elements of the documents included on this page may not be accessible to assistive technologies. Please contact us to request further accessibility assistance.