Our Stage 3 Summary Report and final Stage 3 reports below provide an update on the progress of Australia’s Global Power System Transformation (G-PST) Roadmap which was launched in 2022. In 2025, the GPST initiative evolved and in Australia, now operates under the lead of CSIRO and AEMO as the Australian Research in Power Systems Transition (ARPST).
Development of the Roadmap represented Stage 1 work which outlined a research path across nine key topics on preparing a power system that provides secure and reliable operation during the energy transition to a decarbonised global electrical grid with high penetration of renewables.
The Stage 3 reports contain summaries for each of the appointed research topics to:
- clearly describe progress in the research topic to the end of 2023/2024.
- map this current research within the overall Roadmap for each research topic.
- propose future work for the next round of research scheduled for Stage 4 in Financial Year 2024/25.
These Stage 3 reports will be used to:
- explore opportunities to secure additional funding for expansion of the work into Southeast Asian countries.
- expand research in distributed energy resource (DER) integration as its importance is increasingly internationally recognised.
Executive Summary
- Stage 3 Research Program Summary Report
- Stage 3 Research Program Summary Report
- Stage 3 Presentation Australian Research Leadership in the GPST
Stage 3 Research Reports by Topic
The information in each report has been provided by the research organisations appointed each project.
- Topic 1 — Advanced inverter applications (and requirements) for current-limited grid-forming inverters
- Topic 1 — Advanced inverter applications (and requirements) for current-limited grid-forming inverters
- Topic 2 — Analytical methods for determination of stable operation of IBRs in a future power system
- Topic 2 — Analytical methods for determination of stable operation of IBRs in a future power system
- Topic 3 — Control Room of the Future
- Topic 3 — Control Room of the Future
- Topic 4 — Planning
- Topic 4 — Planning
- Topic 5 — The role of inverter-based resources during system restoration
- Topic 5 — The role of inverter-based resources during system restoration
- Topic 7 — Power System Architecture
- Topic 7 — Power System Architecture
- Topic 8 — Distributed Energy Resources (DERs)
- Topic 8 — Distributed Energy Resources (DERs)
- Topic 9 — Distributed Energy Resource and Stability
- Topic 9 — Distributed Energy Resource and Stability
Note: The research topic 6 on Services was not progressed in 2023/24. CSIRO will include Topic 6 in the 2024/25 stage.
Request accessibility assistance
Some elements of the documents included on this page may not be accessible to assistive technologies. Please contact us to request further accessibility assistance.
Our Stage 3 Summary Report and final Stage 3 reports below provide an update on the progress of Australia’s Global Power System Transformation (G-PST) Roadmap which was launched in 2022. In 2025, the GPST initiative evolved and in Australia, now operates under the lead of CSIRO and AEMO as the Australian Research in Power Systems Transition (ARPST).
Development of the Roadmap represented Stage 1 work which outlined a research path across nine key topics on preparing a power system that provides secure and reliable operation during the energy transition to a decarbonised global electrical grid with high penetration of renewables.
The Stage 3 reports contain summaries for each of the appointed research topics to:
- clearly describe progress in the research topic to the end of 2023/2024.
- map this current research within the overall Roadmap for each research topic.
- propose future work for the next round of research scheduled for Stage 4 in Financial Year 2024/25.
These Stage 3 reports will be used to:
- explore opportunities to secure additional funding for expansion of the work into Southeast Asian countries.
- expand research in distributed energy resource (DER) integration as its importance is increasingly internationally recognised.
Executive Summary
- Stage 3 Research Program Summary Report PDF (2 MB)
- Stage 3 Research Program Summary Report DOCX (10 MB)
- Stage 3 Presentation Australian Research Leadership in the GPST PDF (3 MB)
Stage 3 Research Reports by Topic
The information in each report has been provided by the research organisations appointed each project.
- Topic 1 — Advanced inverter applications (and requirements) for current-limited grid-forming inverters PDF (10 MB)
- Topic 1 — Advanced inverter applications (and requirements) for current-limited grid-forming inverters DOCX (12 MB)
- Topic 2 — Analytical methods for determination of stable operation of IBRs in a future power system PDF (5 MB)
- Topic 2 — Analytical methods for determination of stable operation of IBRs in a future power system DOCX (16 MB)
- Topic 3 — Control Room of the Future PDF (3 MB)
- Topic 3 — Control Room of the Future DOCX (4 MB)
- Topic 4 — Planning PDF (13 MB)
- Topic 4 — Planning DOCX (54 MB)
- Topic 5 — The role of inverter-based resources during system restoration PDF (4 MB)
- Topic 5 — The role of inverter-based resources during system restoration DOCX (5 MB)
- Topic 7 — Power System Architecture PDF (20 MB)
- Topic 7 — Power System Architecture DOCX (29 MB)
- Topic 8 — Distributed Energy Resources (DERs) PDF (2 MB)
- Topic 8 — Distributed Energy Resources (DERs) DOCX (37 MB)
- Topic 9 — Distributed Energy Resource and Stability PDF (11 MB)
- Topic 9 — Distributed Energy Resource and Stability DOCX (56 MB)
Note: The research topic 6 on Services was not progressed in 2023/24. CSIRO will include Topic 6 in the 2024/25 stage.